SK EN 326-2:2010+A1:2019
Status: Published
Gjuha: English
Faqe: 46
Publikuar: 2019-05-27
Regjistri Kombëtar: 277/2019
Botim:
|
Standardet ndërkombëtare që kanë lidhje
This standard is identical to:
EN 326-2:2010+A1:2014
CEN/TC 112
|
Çmim: 36 €
|
Titulli Shqip
Pllaka me bazë druri - Përzgjedhja e mostrës, prerja e tyre dhe kontrolli - Pjesa 2: Testimi fillestar dhe kontrolli i prodhimit në fabrikë
Titulli Anglisht
Wood-based panels - Sampling, cutting and inspection - Part 2: Initial type testing and factory production control
Scope Shqip
Nuk është hedhur informacion.
Scope Anglisht
This European Standard specifies methods for internal initial type testing (ITT) and internal factory production control (FPC) as well as external control of wood-based panels for their compliance with EN 13986 and other relevant product specifications. However, it may also apply, at the option of the manufacturer, to wood-based panels applied for non-construction purposes.
This European Standard is not applicable for the assessment of compliance with specifications of panels comprised in consignments. In such cases, EN 326-3 applies.
For internal factory production control, if required, methods for the assessment of conformity of batches and of production over longer periods are given.
For external control, if required, methods for the initial inspection of a factory and initial type testing of a product, and for the surveillance of the factory production control, are given.
In the factory production control small test pieces are used. The statistics of evaluation is based on normal distribution.
Komitetet Teknike
ICS
Direktivë
Asnjë informacion i shtuar.
Veprim Kombëtar
Asnjë informacion i shtuar.
Numri Standardit
Gjuha
Status
Publikuar
Faqe
Çmim
Blej
Published
2012-08-21
11
17 €
Pllaka me bazë druri-Marrja e mostrave, prerja dhe kontrolli-Pjesa1: Marrja e mostrave, prerja e copave për provë, përpunimi I rezultateve të provave
Withdrawn
2012-08-21
45
34 €
Pllaka me bazë druri -Marrja e kampionit, prerja e mostrave dhe kontrolli -Pjesa 2 : Testimi fillestar dhe kontrolli i prodhimit në fabrikë
Published
2012-08-21
15
20 €
Pllaka me bazë druri-Marrja e mostrave, prerja dhe kontrolli-Pjesa 3: Kontrolli gjatë dorëzimit të pllakave