Republika e Kosovës
Ministria e Tregtisë dhe Industrisë
Standardizim   

SK EN 50518-1:2014

Shtëpi » Standardizim » SK EN 50518-1:2014
SK EN 50518-1:2014
Status: Withdrawn
Gjuha: English
Faqe: 23
Publikuar: 2014-09-30
I tërhequr: 2024-02-13
Regjistri Kombëtar: 128/2014
Botim:
Standardet ndërkombëtare që kanë lidhje
This standard is identical to:
EN 50518-1:2010
CLC/TC 79
Çmim: 25 €



Titulli Shqip

Qëndra e monitorimit dhe marrjes së alarmit -Pjesa 1 : Kërkesat për vendndodhjen dhe ndërtimin

Titulli Anglisht

Monitoring and alarm receiving centre - Part 1: Location and construction requirements

Scope Shqip

Asnjë informacion i shtuar.

Scope Anglisht

This Part 1 of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by alarm systems takes place as an integrated part of the total safety and security process. The requirements apply for applications in a remote configuration where multiple systems report to a single or multiple Alarm Receiving Centre(s) (ARC) as well as to a single site facility aimed for the monitoring and processing of alarms generated by one or more alarm systems installed within the perimeter of that particular site.

Komitetet Teknike

ICS

Direktivë

Asnjë informacion i shtuar.

Veprim Kombëtar

Asnjë informacion i shtuar.
Numri Standardit
Gjuha
Status
Publikuar
Faqe
Çmim
 
Blej
English
Withdrawn 
2014-09-30 
16 
20 € 
PDF
Blej
Qendra e monitorimit dhe marrjes së alarmit -Pjesa 2 : Kërkesa teknike
English
Withdrawn 
2014-09-30 
12 
17 € 
PDF
Blej
Qendra e monitorimit dhe marrjes së alarmit -Pjesa 3 : Procedurat dhe kërkesat për vënien në punë