SK EN 50518-1:2014
Status: Withdrawn
Gjuha: English
Faqe: 23
Publikuar: 2014-09-30
I tërhequr: 2024-02-13 Regjistri Kombëtar: 128/2014
Botim:
|
Standardet ndërkombëtare që kanë lidhje
This standard is identical to:
EN 50518-1:2010
CLC/TC 79
|
Çmim: 25 €
|
Titulli Shqip
Qëndra e monitorimit dhe marrjes së alarmit -Pjesa 1 : Kërkesat për vendndodhjen dhe ndërtimin
Titulli Anglisht
Monitoring and alarm receiving centre - Part 1: Location and construction requirements
Scope Shqip
Asnjë informacion i shtuar.
Scope Anglisht
This Part 1 of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by alarm systems takes place as an integrated part of the total safety and security process. The requirements apply for applications in a remote configuration where multiple systems report to a single or multiple Alarm Receiving Centre(s) (ARC) as well as to a single site facility aimed for the monitoring and processing of alarms generated by one or more alarm systems installed within the perimeter of that particular site.
Komitetet Teknike
ICS
Direktivë
Asnjë informacion i shtuar.
Veprim Kombëtar
Asnjë informacion i shtuar.
Numri Standardit
Gjuha
Status
Publikuar
Faqe
Çmim
Blej
Withdrawn
2014-09-30
16
20 €
Qendra e monitorimit dhe marrjes së alarmit -Pjesa 2 : Kërkesa teknike
Withdrawn
2014-09-30
12
17 €
Qendra e monitorimit dhe marrjes së alarmit -Pjesa 3 : Procedurat dhe kërkesat për vënien në punë