DS CEN/TR 14547:2014
Status: Published
Gjuha: English
Faqe: 64
Publikuar: 2014-01-14
Regjistri Kombëtar:
Botim:
|
Standardet ndërkombëtare që kanë lidhje
This standard is identical to:
CEN/TR 14547:2005
CEN/TC 283
|
Çmim: 42 €
|
Titulli Shqip
Skemat e marrjes së mostrës për vlerësimin e konformitetit të pjesës së tretë të pastërtisë në artikujt me metale të çmuar
Titulli Anglisht
Sampling schemes for third party conformity assessment of fineness in precious metal articles
Scope Shqip
Asnjë informacion i shtuar.
Scope Anglisht
This Technical Report specifies an acceptance sampling system of single sampling plans both for inspection by attributes and for inspection by variables. The attributes plans are of the accept-zero form, i.e. no lot is accepted if the sample from it contains one or more nonconforming articles. (For the purposes of this Technical Report, a nonconforming article is a precious metal article containing less than the nominal proportion by weight of the precious metal). The variables plans generally require smaller sample sizes than the attributes plans, but require the precious metal content of all the sampled articles to exceed the nominal content by at least a specified amount.
The objective of this Technical Report is to provide accept-zero schemes and procedures for assuring an upper limit to the long-term percentage of nonconforming precious metal articles in the market place (i.e. the percentage of articles reaching the market place that contain less than the nominal proportion of precious metal) by means of the lowest practicable sample sizes. The upper limit provided by this Technical Report is 1,47% nonconforming. The objective is achieved in three ways:
a) the sample size reduces as the total number of articles accepted in all the lots since the last non-acceptance increases;
b) if quality is consistently high, then subject to certain conditions it will be possible to switch from sampling by attributes to sampling by variables;
c) under sampling by variables, further reductions in sample size may be achieved by switching from the unknown standard deviation method (the "s" method) to the known standard deviation method (the "s" method) if there is sufficient evidence that the process standard deviation is constant....